Level 4 and Level 5
Commissioning Scripts from Your Site's Documents
Visum produces Level 4 functional performance tests and Level 5 integrated systems tests from a model of how the equipment is connected at the site, built from the site's sequence of operations and its single-line diagrams or piping and instrumentation diagrams, and a working model of each piece of equipment. Every step carries the expected result and its source, or is flagged for you to supply.
Presented at OCP Global Summit 2026 with Lawrence Berkeley National Laboratory.
Eaton 9395 UPS Functional Test:
12 Tests, 53 Steps
- Each step cited to a manual page or flagged
- Every step carries the expected result
- Where no document gives a value, the step is flagged for you to supply
Word, plus a spreadsheet export for commissioning platforms
- 1One row per test step
- 2The action, the expected result and the source page
- 3Blank columns for actual result, pass or fail, and initials
Scripts from the Equipment and Site Models
Visum reads the site's sequence of operations (SOO) first, for the expected response across equipment; the single-line diagram (SLD) or the piping and instrumentation diagram (P&ID), depending on the equipment, for which breaker or valve is operated and in what order; and the project specification for acceptance values. From these documents Visum builds a model of how the equipment is connected at that site, and combines it with a working model of each piece of equipment, such as a coolant distribution unit or a UPS, built from the manufacturer's manuals and drawings. The scripts come from the equipment and site models.
Operators, Manufacturers, Commissioning Firms and Maintenance Companies
Level 4 FPT and Level 5 IST scripts, every step cited or flagged.